| · | Choose a work center with the Work Center field.
|
| · | Choose a year with the Year field.
|
| · | Move the cursor to the Weekly Schedules List field. Click on the desired weekly schedule. Holding down the mouse button, drag the rectangle that appears to the desired week block on the Calendar. If you want to 'unassign' a work schedule from a specific week, click on the none option in the Weekly Schedules List (always located at the top of the Weekly Schedule list). Holding down the mouse button, drag the rectangle that appears to the desired week block on the Calendar.
|
| · | Release the mouse button. The week block color changes to match the color of the weekly schedule in the Weekly Schedules List.
|
| · | Repeat steps 4 and 5 as many times as needed.
|
| · | Click on the Save button.
|