changing a report
There may be times when a scheduled report needs to be changed. Shift changes, period changes, day of the week and even the type of report can be changed. To make changes:| · | Move the cursor down the report list to the desired choice
|
| · | Click on the arrow to the right of the report field.
|
| · | Choose the report you want by sliding the pointer down the selection list to the appropriate line
|