Skip to content
standard cycle
Machine-based parameter defining the normal machine cycle time for a job. When a machine is up, your system uses cycle tolerance and standard cycle to determine whether the red (signifying slow cycles), green (signifying normal cycles), or yellow (signifying fast cycles) performance light should be on. See Average Cycle for more details. The range is 0.5 to 3276.7 seconds.