changing forecast start date
The start date displayed is the date Labor Forecasting will start calculating manning factors for the scheduled jobs. To change the start date:| · | Move the cursor to the start date field
|
| · | Type in the date value. Format is Day/Month/Year (dd/mm/yy).
|
- or -
| · | Position the mouse pointer over the arrow to the right of the Start Date field. A pop up calendar will display the current date selected.
|
| · | Choose a start date by navigating the calendar to the selected date. To select the current date, select the "Today" button at the bottom of the pop up calendar.
|
NOTE: Dates prior to the current date cannot be selected. Labor Forecast was designed to forecast man-hour needs for jobs currently running and scheduled to run in the future.