PlantStar Panorama Help

Job Schedule Board



In order to collect process variables and production data for a machine, a job must be assigned on that machine. The process of scheduling or queuing jobs is handled through the Job Schedule window.

The Job Schedule window consists of a Gantt style scheduling board. Calendar time is shown on the X-axis. Machines within a selected display group are shown on the Y-axis. Each row represents a machine's job queue and each rectangular block is a scheduled job. The first rectangular block for each machine is its current job. The block length indicates the expected run time for the job. Block labels are selectable. The caption display on the block labels can be either the job or product names for the selected job.

NOTE: If the job scheduled is a family job, the block length indicates the expected run time of the longest running child job.

A job is scheduled by selecting a work order and placing it in the job queue of a given machine. By default, jobs are scheduled sequentially from left to right. There are two scheduling methods available within your system:

·Schedule jobs by earliest start date (default)  
·Schedule jobs by required by (due date)  

The default method on the Job Schedule window is for jobs to run immediately following the completion of previously-queued jobs. The estimated completion time of a job becomes the starting time for the next queued job. Under this method, jobs that are expected to be completed on time are shown in green. A red rectangular block indicates that a job will not complete by its estimated completion date. The default method is active unless the second scheduling method has been activated and/or saved during a previous session.

The second method is to schedule jobs by required by due date. This method places a selected job (or jobs) on the job board at the latest possible time which allows it to be completed by its due date. Specifically, a job's required by date is used as the starting point. The length of time to run a job is then used to walk backwards through the shift schedule to estimate the start date. Using this method, gaps may occur between a job's starting time and a previous job's ending time. These "gaps" are represented on the job board by gray blocks and indicate slack time where new jobs can be scheduled. Under this method, jobs that are expected to be completed on time are shown in green. If this method causes a subsequent job to become late, the late job's rectangular block is colored orange.

The marker, located along the top of the job board area, indicates which jobs are scheduled according to their due dates. All jobs to the left of this marker are scheduled according to the earliest possible start -- a job starts immediately upon completion of the previous job (method one). All jobs to the right of this marker are displayed on the job board according to their due dates (method two). (For more detailed explanations, refer to the field help provided on the icon.)

The Job Schedule window also enables you to edit a work order, current job, or queued job.

NOTE: You must have the proper privileges in order to schedule jobs. See your System Administrator if you do not have the Scheduling privilege.

Where can you find it?

·Open the Schedule menu within Monitor.  
·Click on the Job Schedule window.  

What do you want to know about?

General Topics:
Job Schedule Board Overview  
Job Scheduling Concepts  
Creating Work Orders  
Loading a Product Standard onto a Job  
Saving Jobs as a Standard  

Work Order Functions:
Creating Work Orders  
Customizing the Work Order List  
Refreshing the Work Order List  

Job Functions:
Selecting Jobs from the Schedule Board  
Editing Jobs from the Schedule Board  
Deleting Jobs from the Schedule Board  
Searching for a Job  
Viewing Job Summary Information  

Scheduling Functions:
Moving Jobs Around the Schedule Board  
Selecting a Time Scale  
Selecting Display Groups from the Schedule Board  
Scheduling Jobs by Earliest Start Date  
Scheduling Jobs by Due Date  
Viewing Production Hours  
Viewing the Shift Schedule  
Identifying Machines with Job Standards  
Committing a Schedule  
Discarding a Schedule